All Mahishmati Army units have withdrawn to the west to the city of Amaahindra. The ROD 7th Armored Brigade has withdrawn to the west as well, heading toward Amaahindra and the ROD support area. All three ROD artillery battalions are still in place, several km outside of the DMZ.
The ROD 2nd Armored Brigade has withdrawn to the agreed upon DMZ boundary. They are in compliance with the cease fire agreement, but occupying fighting positions and assembly areas. They have topped off their fuel and ammo in the event that the cease fire fails. 5th Tank is north of the river, 11th Tank and 7th Mech are south of the river. The pontoon bridge built by Mahishmati combat engineers is still in place.
At home, the carrier Vengeance and the remnants of battle groups 5, 7, and 9 have arrived in the ROD. The number of damaged ships far exceeds the dry dock capacity in the ROD, so we are prioritizing the repair work. The carrier Vengeance went straight into dry dock at the DiSCO Yard (Dalmatian Ship Building Company), as did the cruiser Shepherd. The air wing (which is actually made up of surviving aircraft from carrier air wings 1, 3, and 5) landed at Naval Station Saint Catherine. Aircraft detachments (EA-6Bs and E-2Cs) will return to their parent squadrons. The remaining aircraft will temporarily be grouped into Provisional Air Wing 1. The individual squadrons and air wings will be rebuilt as replacement aircraft and pilots become available, but this will take some time to accomplish.
Pictured below are M60A3 tanks from 13th Tank Battalion (7th Armored Brigade) moving west past a platoon of M109A6 howitzers from 18th Artillery Battalion.
